Campus Operations will conduct irrigation repair work, resulting in temporary walkway closures in two areas of campus.
More Information:
Temporary Walkway Closures Oct. 5-8
Campus Operations will conduct irrigation repair work Oct. 5-8, resulting in temporary walkway closures in two areas of campus:
- Between S Building and B Building near Tyee River Road
- Near T Building, between the Circle Cafe and the flagpole roundabout
Please allow extra time when traveling through these areas.
Access to S Building and the second-floor walkway to B Building will remain available from the south side of the buildings.
The west entrance to T Building will remain accessible during the work.
Last Updated September 29, 2026