Campus Ops: A Building Rain Garden Work, May 5

Work on the stormwater line systems at the south end of the A Building covered corridor is scheduled to take place May 5–June 30.

More Information:

Stormwater Line Repairs and Rain Garden Installation Begin May 5

From May 5 through June 30, Bellevue College will conduct repair work on the stormwater line systems in the south end of the A Building covered corridor.

This project will address a broken underground stormwater line by installing a new rain garden designed to better manage water flow during heavy rainfall. The area has experienced persistent drainage issues, and the rain garden will provide an environmentally friendly solution while enhancing the space with native, shade-tolerant plant species.

Please expect some construction noise and limited access in the courtyard during this period. Thank you for your patience as the college works to improve campus sustainability and infrastructure.

Last Updated May 2, 2025